Full Electrical Installation for School in Highgate

Full Electrical Installation for School in Highgate

CLS Total Solutions Contribute to Revitalised Educational Spaces

The Camden Schools project took as its goal a three-year revitalisation and modernisation initiative, transforming existing teaching spaces across multiple schools. The scope of the project included classrooms, a new sixth form building, science labs, a sports hall, and a dining hall.

(more…)

Read More
Full M&E for New Lidl in Manchester

Full M&E for New Lidl in Manchester

New Lidl Provides Regeneration for Broughton, Salford

When it was built, back in the 1970s, Mocha Parade provided a much-needed shopping centre for the residents of Lower Broughton. Over the decades, though, the Parade has fallen into disrepair; as once thriving shops moved away the area become an eyesore.

(more…)

Read More
Full M&E for King’s Cross Apartment Block

Full M&E For King’s Cross Apartment Block

101 Camley Street is an Ideal of City Centre Living

101 Camley Street, a prominent new development in King’s Cross, London, stands as a testament to contemporary urban design and sustainable living. The building integrates 121 thoughtfully designed apartments and over 30,000 square feet of versatile commercial space.

(more…)

Read More
Full M&E For New Lidl in Oxford

Full M&E For New Lidl in Oxford

Lidl in Oxford – CLS Provides Full M&E Including Design

Lidl is a household name in UK retail, renowned for its high-quality, low-price products. With over 960 stores and 13 distribution centres, Lidl has established itself as a significant presence in the supermarket sector. In recent years, the company has embarked on an ambitious expansion plan, aiming to open 1,000 new stores. One of these new stores is located in Templars Square Shopping Park, Cowley, Oxford.


(more…)

Read More
Electrical Installation for Award Winning Birmingham Project

Electrical Installation for Award Winning Birmingham Project

The Exchange: A Symbol of Birmingham’s Past and Present

The Exchange, a Grade II listed building in Birmingham’s Centenary Square, stands as a testament to the city’s rich heritage and its vibrant future. Originally opened in 1933, the handsome structure served as the headquarters of the Birmingham Municipal Bank, and then TSB, until 2006. In 2017, the University of Birmingham acquired the building and embarked on an ambitious refurbishment and expansion project, transforming it into a stylish city-centre-based campus.


(more…)

Read More
M&E Design for Taco Bell, Camberley, Surrey

M&E Design for Taco Bell, Camberley, Surrey

Powering Up Taco Bell’s Success

In 2010, Taco Bell, the Mexican fast-food restaurant, made its debut in the UK. Now it has over 135 outlets thanks to a period of rapid expansion over the past two years. Alongside the opening of new sites, Taco Bell has embraced a fresh wave of branding, and CLS Total Solutions played an integral role in preparing the Camberley restaurant earlier this year.


(more…)

Read More